One way to find a bottleneck is to run a capacity resource profile.
Correct Answer:
Verified
Q45: A process batch should be no larger
Q46: The "dollar days" inventory measurement can be
Q47: An MRP system can allow for product
Q48: According to the theory of constraints, a
Q49: On an assembly line, a transfer batch
Q51: Smaller transfer batches give lower work-in-process inventory
Q52: JIT requires work-in-process when used with Kanban
Q53: According to the theory of constraints, throughput
Q54: A way to find a bottleneck is
Q55: The "dollar days" inventory measurement may be