In a process sequence where a product flows from process A to process B, process A is called the mother process.
Correct Answer:
Verified
Q63: MRP uses forward scheduling, beginning with the
Q64: In this type of production, the typical
Q65: Looking at the loads that are placed
Q66: Labor cost and machine hours are ignored
Q67: Because of statistical fluctuation (processing times vary
Q69: JIT requires vendors to be located nearby.
Q70: In this type of production, the typical
Q71: There is little to be gained by
Q72: There is no problem with inventory as
Q73: In synchronous manufacturing thinking, unbalanced capacity is