The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
Correct Answer:
Verified
Q1: A system that "backward schedules" is designed
Q2: Priority rules are the rules used to
Q3: In production scheduling, the process of determining
Q4: Under the STR/OP sequencing priority rule, orders
Q5: A shop-floor control system is a system
Q7: Using the random order or "whim" priority
Q8: Theoretically, all schedules are feasible when finite
Q9: In infinite loading, no consideration is given
Q10: One of the principles of workcenter scheduling
Q11: The assignment method of job sequencing is