Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is not a reason that the process being monitored with the chart should be investigated?
A) A large number of plots are close to the upper or lower control lines.
B) The behavior of the plots is erratic.
C) A single plot falls above or below the control limits.
D) Thee is a change in raw materials or operators.
E) There is a run of five above the central line.
Correct Answer:
Verified
Q21: LTPD in acceptance sampling stands for lot
Q24: In monitoring process quality, we might use
Q32: Sampling plans are generally displayed graphically through
Q37: You have just used the capability index
Q39: The probability associated with accepting a low-quality
Q44: You want to develop a three-sigma R-chart.
Q48: You are going to develop an R-chart
Q51: You are going to develop an R-chart
Q51: You are developing an X-bar chart based
Q52: You want to determine the upper control
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents