As the acceptable level of detection risk increases,an auditor may change the
A) Assessed level of control risk from a lower level to a higher level.
B) Assurance provided by tests of controls by using a larger sample size than planned.
C) Timing of substantive procedures from year-end to an interim date.
D) Nature of substantive procedures from less effective to more effective procedures.
Correct Answer:
Verified
Q76: The program flowcharting symbol representing a decision
Q77: A procedure that would most likely be
Q82: Assume that an auditor estimates that 10,000
Q83: While substantive procedures may support the accuracy
Q84: Before applying substantive procedures to the details
Q84: In terms of an audit, define substantive
Q85: During consideration of internal control in a
Q86: What are four potential tools available to
Q88: A customer intended to order 100 units
Q89: After obtaining an understanding of internal controls
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents