Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Physics & Astronomy
Study Set
Physics Study Set 2
Quiz 7: Work and Kinetic Energy
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 81
Multiple Choice
A man lifts a 20.0-kg bucket of concrete from the ground up to the top of a 20.0-m tall building. The bucket is initially at rest, but is traveling at 4.0 m/s when it reaches the top of the building. How much work was done by the man in lifting the bucket?
Question 82
Multiple Choice
A ball is thrown upward with a speed and direction such that it reaches a maximum height of 16.0 m above the point it was released. At its maximum height it has a speed of 18.0 m/s. With what speed was the ball released?