In planning a statistical sample for a test of controls,an auditor increased the expected population deviation rate from the rates observed in prior audits because of the results of prior tests of controls and the overall control environment.The auditor most likely would then increase the planned:
A) Tolerable rate of deviation.
B) Allowance for sampling risk.
C) Risk of overreliance.
D) Sample size.
Correct Answer:
Verified
Q23: To statistically evaluate an attributes sampling application,the
Q24: An auditor is testing control procedures that
Q25: Which of the following is not a
Q26: After examining sample items and classifying items
Q27: If the upper limit rate of deviation
Q29: The sample size for a test of
Q30: The procedures for statistical evaluation of tests
Q31: On the basis of attributes sampling,an auditor
Q32: In performing attributes sampling,the auditor will conclude
Q33: In the study of internal control,the auditor
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents