"Total productive maintenance" is best described as:
A) avoiding all breakdown maintenance.
B) doing a great deal of preventive maintenance to try to avoid breakdown maintenance.
C) a JIT approach that takes advantage of cross-training.
D) extending preventive maintenance back to design.
E) none of these.
Correct Answer:
Verified
Q26: The total maintenance curve (preventive maintenance cost
Q31: The frequency of breakdown of a
Q53: The type of maintenance which is periodic
Q63: The average time before breakdown of a
Q64: Attempting to determine when preventive maintenance activities
Q66: Which of the following is the primary
Q67: Breakdown programs often are prioritized such that
Q75: In the area of maintenance, the Pareto
Q78: In the broadest sense, equipment and facilities
Q80: Ideally, preventive maintenance will be performed
A)after a
Unlock this Answer For Free Now!