The operations manager for the Blue Moon Brewing Co. produces two beers: Lite (L) and Dark (D) . He can only get 675 gallons of malt extract per day for brewing and his brewing hours are limited to 8 hours per day. To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract. Each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract. Profits for Lite beer are $3.00 per keg and profits for Dark beer are $2.00 per keg.
-What is the objective function?
A) P = 2L + 3D
B) P = 2L + 4D
C) P = 3L + 2D
D) P = 4L + 2D
E) P = 5L + 3D
Correct Answer:
Verified
Q45: Which objective function has the same slope
Q53: Which of the following could not be
Q56: For the products A,B,C,and D,which of the
Q58: Where is the objective cell located?
A)B2:C2
B)B2:C2,B5:C7,and
Q59: Where are the changing cells located?
A)B2:C2
B)B2:C2,B5:C7,and
Q62: A local bagel shop produces bagels (B)
Q63: The production planner for a private label
Q64: The owner of Crackers, Inc. produces both
Q65: An electronics firm produces two models of
Q66: The production planner for a private label
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents