According to Goldratt:
A) An hour lost at the bottleneck is an hour lost for the entire system.
B) A product coming out of a non-bottleneck is precious and should not be wasted.
C) Maximizing the efficiency of all resources would generate money for the company.
D) Utilization,Productivity,and Operating Expenses are the three vital metrics of a process.
Correct Answer:
Verified
Q8: Scheduling deals with which three conflicting objectives?
A)
Q9: Which of the following is NOT determined
Q9: Critical Ratio is:
A)The ratio of processing time
Q10: A bottleneck is:
A)A resource that has the
Q11: Shortest processing time (SPT)rule means:
A)The job with
Q13: The reason(s)for batch scheduling being a complex
Q15: Which of the following is a performance
Q16: Lead time for completion of a job
Q17: Use a Gantt chart to schedule the
Q19: Finite capacity scheduling assumes which of the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents