The management of Garn Corporation would like to investigate the possibility of basing its predetermined overhead rate on activity at capacity rather than on the estimated activity for the coming year. The Corporation's controller has provided an example to illustrate how this new system would work. In this example, the allocation base is machine-hours and the estimated activity for the upcoming year is 69,000 machine-hours. Capacity is 85,000 machine-hours. All of the manufacturing overhead is fixed and is $4,105,500 per year within the range of 69,000 to 85,000 machine-hours. If the Corporation bases its predetermined overhead rate on capacity but the actual level of activity for the year turns out to be 69,700 machine-hours, the cost of unused capacity shown on the income statement prepared for internal management purposes would be closest to:
A) $772,800
B) $780,640
C) $738,990
D) $41,650
Correct Answer:
Verified
Q266: Look Manufacturing Corporation has a traditional costing
Q267: Coudriet Manufacturing Corporation has a traditional costing
Q268: Njombe Corporation manufactures a variety of products.
Q269: Poma Manufacturing Corporation has a traditional costing
Q270: Adelberg Corporation makes two products: Product A
Q272: Poma Manufacturing Corporation has a traditional costing
Q273: Njombe Corporation manufactures a variety of products.
Q274: Look Manufacturing Corporation has a traditional costing
Q275: Njombe Corporation manufactures a variety of products.
Q276: The management of Garn Corporation would like
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents