Based on a 5% risk of assessing control risk too low, how would an auditor interpret a computed upper deviation rate of 7%?
A) The auditor is willing to accept a deviation rate of 7% before deciding not to rely on the control.
B) There is a 5% chance that the deviation rate in the population is less than 7%.
C) There is a 5% chance that the deviation rate in the population exceeds 7%.
D) There is a 95% chance that the deviation rate in the population equals 7%.
Correct Answer:
Verified
Q19: The tolerable deviation rate for a test
Q20: Which of the following best illustrates the
Q21: An auditor who uses statistical sampling for
Q22: In attributes sampling, a 10% change in
Q23: Auditors who prefer statistical sampling to nonstatistical
Q25: If the expected deviation rate exceeds the
Q26: An advantage of using statistical over nonstatistical
Q27: Statistical sampling provides a technique for:
A)exactly defining
Q28: In which of the following cases would
Q29: If auditors conducting attributes sampling found that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents