As the acceptable level of detection risk increases,an auditor may change the
A) Assessed level of control risk from below the maximum to the maximum level.
B) Assurance provided by tests of controls by using a larger sample size than planned.
C) Timing of substantive procedures from year-end to an interim date.
D) Nature of substantive procedures from less effective to more effective procedures.
Correct Answer:
Verified
Q53: Which of the following procedures most likely
Q61: Significant deficiencies are matters that come to
Q66: In an audit of financial statements of
Q79: When preparing a record of a client's
Q81: Audit evidence concerning proper segregation of duties
Q85: During consideration of internal control in a
Q87: Before applying substantive procedures to the details
Q93: After the auditor has prepared a flowchart
Q96: When communicating internal control-related matters noted in
Q99: In a properly designed internal control system,the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents