Solved

Based on a 5% Risk of Assessing Control Risk Too

Question 24

Multiple Choice

Based on a 5% risk of assessing control risk too low, how would an auditor interpret a computed upper deviation rate of 7%?


A) The auditor is willing to accept a deviation rate of 7% before deciding not to rely on the control.
B) There is a 5% chance that the deviation rate in the population is less than 7%.
C) There is a 5% chance that the deviation rate in the population exceeds 7%.
D) There is a 95% chance that the deviation rate in the population equals 7%.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents