In a job-order costing system that is based on machine-hours,which of the following formulas is correct?
A) Predetermined overhead rate = Actual manufacturing overhead ÷ Actual machine-hours
B) Predetermined overhead rate = Actual manufacturing overhead ÷ Estimated machine-hours
C) Predetermined overhead rate = Estimated manufacturing overhead ÷ Estimated machine-hours
D) Predetermined overhead rate = Estimated manufacturing overhead ÷ Actual machine-hours
Correct Answer:
Verified
Q4: Actual overhead costs are not assigned to
Q9: A company will improve job cost accuracy
Q21: Which of the following statements about using
Q21: The Silver Corporation uses a predetermined overhead
Q22: Reamer Corporation uses a predetermined overhead rate
Q24: Most countries require some form of absorption
Q25: Baj Corporation uses a predetermined overhead rate
Q28: Brothern Corporation bases its predetermined overhead rate
Q51: Valvano Corporation uses a job-order costing system
Q54: Longobardi Corporation bases its predetermined overhead rate
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents