If production was budgeted at 400 units and the actual production was 420 units,what would be the flexible budget variance for materials if the actual cost of materials was $4,150 and the budgeted cost per unit is $10?
A) $50 F
B) $100 F
C) $150 U
D) $200 U
Correct Answer: