The following information relates to Markely Manufacturing:
There is a wait time of 8 minutes before the Mixing Department begins a batch, 5 minutes between the Mixing and Moulding departments, a move and pre-wait between Moulding and Casting of 10 minutes, and a move and pre-wait between the Casting and Finishing departments of 12 minutes.
-Refer to the figure.What is the production rate?
A) 4 units per hour
B) 10 units per hour
C) 15 units per hour
D) 30 units per hour
Correct Answer:
Verified
Q6: What results from the lean manufacturing benefits
Q7: What is the focus of the order
Q8: What is reducing the time it takes
Q9: The following information relates to Markely
Q10: What is a difference between Toyota's lean
Q12: What are the two basic types of
Q13: What is the focus of the new
Q14: Which is a benefit of lean manufacturing?
A)decreased
Q15: What is the value stream?
A)all activities required
Q16: What term is defined as the worth
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents