Ace Plastics produces many different kinds of products all in one manufacturing facility. They have identified four activities for their costing system:
Materials management - allocated by number of purchase orders
Chemical processing - allocated on metric tons
Molding - allocated on direct labor hours
Packaging - allocated by number of units produced
The activity rates are as follows:
Ace received an order for 3,000 plastic toys. The engineering design shows that the order will require $540 of direct material cost in total, $90 of direct labor cost, will require 4 purchase orders, will use 2 metric tons of chemical base, will need 8 direct labor hours, and will produce 3.000 units of product. What will the full production cost of the order be?
A) $630
B) $645
C) $1,095
D) $1,185
Correct Answer:
Verified
Q22: Which of the following would most likely
Q39: Pitt Jones Company had the following
Q40: Orlando Avionics makes three types of
Q41: An activity-based costing system improves the allocation
Q42: Orlando Avionics makes three types of
Q43: Orlando Avionics makes three types of
Q46: Formosa Steel Products makes steel building
Q47: Traditional costing systems can distort unit manufacturing
Q48: Ace Plastics produces many different kinds
Q49: AAA Metal Bearings produces two sizes
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents