In 2013,Bootcamp Mining Inc.purchased land for $5,600,000 that had a natural resource supply estimated at 4,000,000 tons.When the natural resources are removed,the land will have an estimated value of $640,000.The present value of the expected cash outflows for the required restoration cost for the property is estimated to be $800,000.
Development and road construction costs on the land were $560,000,and a building was constructed at a cost of $88,000 with an estimated $8,000 salvage value when all the natural resources have been extracted.
During 2014,additional development costs of $272,000 were incurred,but additional resources were not discovered.Production for 2013 and 2014 was 700,000 tons and 900,000 tons,respectively.
Compute the depletion charge for 2013 and 2014.(Include depreciation on the building,if any,as a depletion charge. )Round depletion charge to the nearest cent.
Correct Answer:
Verified
Q68: The Corey Company exchanged equipment costing $190,000
Q69: Depreciation is the systematic allocation of historical
Q70: Which of the following assets generally is
Q71: The most recent annual report of the
Q72: The following is a schedule of machinery
Q74: Algon Company owns a machine that cost
Q75: The impairment test for an intangible asset
Q76: The Fanfare Company applied for and received
Q77: Information concerning Santori Corporation's intangible assets is
Q78: Which of the following represents the maximum
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents