Installing a New Control Panel on a Factory Production Machine

Question 76

Multiple Choice

Installing a new control panel on a factory production machine would be classified in the ABC cost hierarchy as a (an)


A) output unit-level cost.
B) batch-level cost.
C) product-sustaining cost.
D) facility-sustaining cost.
E) period cost because it is not related to the cost hierarchy.