When Using an Activity-Based Costing System,which of the Following Is

Question 95

Multiple Choice

When using an activity-based costing system,which of the following is the formula for allocating costs to products or services?


A) Activity rate x activity driver consumption
B) Activity rate x amount in activity pool
C) Predetermined manufacturing overhead rate x actual activity
D) None of these ans choices are correct.

Correct Answer:

verifed

Verified