Answer the following questions using the information below:
Captain Carl's Seascapes produces sea pictures for sale through catalogs. The company has two workstations, photo production and framing. The photo production station is limited by the speed of operating the photo development machine. Framing is limited by the speed of the employees. Framing normally waits for work from photo production. Each department works an eight-hour day. If Captain Carl's Seascapes adds an earlier half shift so that photo production begins work four hours earlier than framing each day, the two departments generally finish their work at about the same time. Not only does this eliminate the bottleneck, but it also increases finished units produced each day by 200 units. All units produced can be sold. The cost of operating the photo production department four more hours each day is $1,250. The contribution margin of the finished products is $10 each.
-What is the total production per day if the change is made?
A) 50 units
B) 200 units
C) 400 units
D) 600 units
Correct Answer:
Verified
Q123: Increasing the capacity of a bottleneck resource
Q126: Acme Janitor Service has always taken pride
Q128: Identifying and minimizing the sources of non-value-added
Q134: Investing in a new equipment,such as flexible
Q136: Longer manufacturing cycle times results in _.
A)
Q137: Answer the following questions using the information
Q139: Inventory carrying costs equal the _.
A) opportunity
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents