Joe's Copy Centre hires a new employee.Joe knows he has to be patient with the employee until the employee gains enough experience to meet production standards.Joe is unsure of the learning curve in his operation, but he knows the first job by a new employee averages 40 minutes and the second job averages 32 minutes.Assume all jobs to be equal in size.Required:
a.What is the learning-curve percentage, assuming the cumulative average-time method?
b.What is the time for a new employee to do 32 jobs with this learning curve using the cumulative average-time method? You may use an index of -0.1520.
Correct Answer:
Verified
Q241: Andrew Pallet Co., Inc.manufactures pallets for various
Q242: A learning curve is a function
A)that measures
Q243: Each time Maiertree Care hires a new
Q244: Vestor Ltd.has estimated a 90% incremental unit
Q245: When an average unit of time declines
Q246: Vestor Ltd.has estimated a 90% cumulative average-time
Q248: To complete the first setup on a
Q249: To complete the first setup on a
Q250: An experience curve
A)is a narrower application of
Q251: Harry's Picture manufactures various picture frames.Each new
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents