Irene Manufacturing uses a predetermined overhead allocation rate based on direct labor cost. At the beginning of the year, the company estimated total manufacturing overhead costs at $1,020,000 and total direct labor costs at $820,000. In June, Job 711 was completed. The details of Job 711 are shown below. How much was the cost per unit of finished product? (Round any percentages to two decimal places and your final answer to the nearest cent.)
A) $157.50
B) $197.70
C) $169.70
D) $219.70
Correct Answer:
Verified
Q87: Haddows, Inc. completed Job GH6 last
Q89: The Carlin Fabrication Plant suffered a
Q90: Jezebel, Inc. completed Job 12 and
Q91: The Quadrangle Fabrication Plant suffered a
Q94: Jordan Manufacturing uses a predetermined overhead
Q95: Q-dot Manufacturing uses a predetermined overhead
Q96: Doric Agricultural Corporation uses a predetermined
Q97: Gardner Machine Shop estimates manufacturing overhead costs
Q97: Happy Clicks, Inc. uses a predetermined
Q98: The journal entry to record allocation of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents