A demand-pull system in which each component in a production line is produced immediately as needed by the next step in the production line is referred to as:
A) just-in-time purchasing.
B) materials requirements planning.
C) economic order quantity (EOQ) .
D) relevant total costs.
Correct Answer:
Verified
Q88: In a just-in-time inventory system,there is less
Q89: Just-in-time purchasing describes the flow of goods,services,and
Q90: Wheels Company produces wheel assemblies for the
Q91: All of the following are potential financial
Q92: When using a vendor-managed inventory system to
Q95: The social and environmental performance of their
Q96: The time from when an order is
Q97: Costs of setting up a production run
Q97: A push-through system that manufactures finished goods
Q98: A system that has a single database
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents