Solved

Glenelg Sheet Metal Company Has Two Divisions

Question 105

Essay

Glenelg Sheet Metal Company has two divisions.The Raw Material Division prepares sheet metal at its warehouse facility.The Fabrication Division prepares the cut sheet metal into finished products for the air conditioning industry.No inventories exist in either division at the beginning of 2017.During the year,the Raw Material Division prepared 450 000 square metres of sheet metal at a cost of $1 800 000.All the sheet metal was transferred to the Fabrication Division where additional operating costs of $1.50 per square metre were incurred.The 450 000 square metres of finished fabricated sheet metal products were sold for $3 875 000.
Required:
a.Determine the operating profit for each division if the transfer price from Raw Material to Fabrication is at a cost of $4 per square metre.
b.Determine the operating profit for each division if the transfer price is $5 per square metre.
c.Since the Raw Materials Division sells all of its sheet metal internally to the Fabrication Division,does the Raw Materials manager care what price is selected? Why? Should the Raw Materials Division be a cost centre or a profit centre under the circumstances?
_____________________________________________________________________________________________
_____________________________________________________________________________________________

Correct Answer:

verifed

Verified

a.
\[\begin{array} { | l | r | r | }
\ ...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents