Answer the following questions using the information below:
Nichols Inc. manufactures remote controls. Currently the company uses a plant-wide rate for allocating manufacturing overhead. The plant manager is considering switching-over to ABC costing system and has asked the accounting department to identify the primary production activities and their cost drivers which are as follows:
The current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $200 per labor hour.
-What are the indirect manufacturing costs per remote control assuming an activity-based-costing method is used and a batch of 100 remote controls are produced? The batch requires 450 parts,8 direct manufacturing labor hours,and 10 minutes of inspection time.
A) $11.00 per remote control
B) $10.90 per remote control
C) $11.05 per remote control
D) $10.95 per remote control
Correct Answer:
Verified
Q104: Smaller cost distortions occur when the traditional
Q105: Machine depreciation can be a cost-driver for
Q106: Answer the following questions using the
Q107: Answer the following questions using the
Q110: Answer the following questions using the
Q111: For service organizations,activity-based cost systems may be
Q112: The homogeneous cost pools and the choice
Q114: Gregory Enterprises has identified three cost
Q117: Implementing activity-based costing system involves use of
Q120: Which of the following statements is true
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents