With mixed costs,the ________ element is unchanged over the relevant range and the ________ element varies proportionately with cost-driver activity.
A) variable cost; fixed cost
B) fixed cost; variable cost
C) fixed cost; step cost
D) step cost; variable cost
Correct Answer:
Verified
Q24: Variable costs per unit of the cost
Q25: Two types of costs that each combine
Q26: It is misleading to call a cost-volume-profit
Q27: Which example is NOT a step cost?
A)
Q28: Total variable costs increase when the cost-driver
Q30: In a small construction firm,a crew supervisor
Q31: The relevant range is the limit of
Q32: On a cost-volume-profit graph,the vertical distance between
Q33: A compensation plan where the sales force
Q34: With mixed costs,the fixed cost element is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents