Pinacle Corp.budgeted $700,000 of overhead cost for the current year.Actual overhead costs for the year were $650,000.Pinacle's plantwide allocation base,machine hours,was budgeted at 100,000 hours.Actual machine hours were 80,000.A total of 100,000 units was budgeted to be produced and 98,000 units were actually produced.Pinacle's plantwide factory overhead rate for the current year is:
A) $8.13 per machine hour
B) $7.00 per machine hour
C) $6.50 per machine hour
D) $8.75 per machine hour
Correct Answer:
Verified
Q2: Managers depend on accurate factory overhead allocation
Q2: Use of a plantwide factory overhead rate
Q5: A plantwide factory overhead rate is computed
Q6: A single plantwide overhead rate method is
Q8: If the budgeted factory overhead cost is
Q9: Product costing consists of only direct materials
Q11: Zorn Co.budgeted $600,000 of factory overhead cost
Q12: The selection of the factory overhead allocation
Q12: Everest Co.uses a plantwide factory overhead rate
Q35: Which of the following does not rely
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents