Total costs for Watson & Company at 100,000 units are $350,000, while total fixed costs are $150,000. The total variable costs at a level of 200,000 units would be
A) $700,000.
B) $175,000.
C) $400,000.
D) $300,000.
Correct Answer:
Verified