Sweet-Dreams Inc. manufactures custom pillows. Five jobs are waiting to be processed. Job A has a flow time of 8 days, job B has a flow time of 10 days, job C has a flow time of 15 days, job D has a flow time of 20 days, and job E has a flow time of 27 days. What is the mean flow time?
A) 8 days
B) 10 days
C) 7 days
D) 0 days
E) 16 days
Correct Answer:
Verified
Q35: Using the S/RO rule, which of the
Q36: A Dallas firm manufactures dishwashing liquid. The
Q37: What does makespan measure?
A) WIP inventory
B) due-date
Q38: What does job flow time measure?
A) the
Q39: A measure of response time is:
A) makespan
B)
Q41: Green Inc. manufactures a variety of wooden
Q42: Job A is due on day 15,
Q43: Which of the following scheduling rules minimizes
Q44: Seven jobs must be scheduled. Each of
Q45: Job A is due on day 15,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents