The normal times for basic,generic micro motions developed by an outside organization in a laboratory-type environment are referred to as
A) standard times.
B) normal times.
C) predetermined motion times.
D) elemental times.
Correct Answer:
Verified
Q13: How many cycles should be used in
Q14: _ time is the time required by
Q15: Rating worker performance is typically an objective,easy
Q16: How many cycles should be used in
Q17: Determining the length of time it takes
Q19: Work sampling is a technique for determining
Q20: The basic principle underlying an incentive piece-rate
Q21: How many observations should be taken to
Q22: A work sampling study is being conducted
Q23: As part of a time study a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents