The degree of compatibility between the firm's existing procedures and personnel skills and the requirements of the new system is called
A) technical feasibility
B) operational feasibility
C) schedule feasibility
D) legal feasibility
Correct Answer:
Verified
Q37: Examples of one-time costs include all of
Q38: Site preparation costs include all of the
Q39: If individual modules are thoroughly tested,it is
Q40: The systems steering committee is responsible for
Q41: The systems analysis report does not
A)identify user
Q43: Typically a systems analysis
A)results in a formal
Q44: Which of the following is not an
Q45: A commercial software system that is completely
Q46: Project feasibility includes all of the following
Q47: A disadvantage of surveying the current system
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents