Which of the following is an example of value-added time?
A) Processing time
B) Wait time during inspection
C) Wait time in inventory
D) Both B and C
Correct Answer:
Verified
Q22: Setups are a significant time-consuming activity in
Q38: A process-oriented layout segments production facilities into
Q39: Maximum effectiveness and efficiency are reached when
Q40: Maximum effectiveness and efficiency are reached when
Q41: Inventory reduction is a _ principle.
A) lean
B)
Q43: Which of the following are features of
Q44: Christmas Express makes wreaths in batch sizes
Q45: Examples of transforming a traditional manufacturing environment
Q46: _ manufacturing philosophy emphasizes quality and zero
Q47: Which of the following drives work-in-process inventory