FlexSteal,marketed as a miracle brush-on sealant and baldness cure,is manufactured at three plants that are struggling to keep up with the demand at the four regional centers.The cost to ship a truckload from each of the existing plants to the regional centers is shown in the table.Note that the capacity and the total demand are both measured in truckloads.
The supply chain manager has explored plant construction costs in two other cities as well as the cost to ship a truckload from each of the plants to the regional centers.The current plan is to build another plant with a capacity of 400 to allow room for sales growth.The construction cost for the new plants and cost to ship to each of the regional centers is shown here.
-What is the constraint associated with Atlanta for the existing set of plants and regional centers?
A) 75x1A + 88x2A + 82x3A = 350
B) x1A + x2A + x3A = 350
C) 75x1A + 88x2A + 82x3A ≤ 350
D) x1A + x2A + x3A ≤ 350
Correct Answer:
Verified
Q70: A manufacturer of cat towers wishes
Q71: Models that minimize total costs are used
A)from
Q72: FlexSteal,marketed as a miracle brush-on sealant
Q73: A manufacturer of cat towers wishes
Q74: Which of these is considered a hard
Q76: The objective of the third phase of
Q77: Managers making facility location decisions should carefully
Q78: What is the total (construction plus operating)cost
Q79: Which of these is considered a soft
Q80: FlexSteal,marketed as a miracle brush-on sealant
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents