Snappy Company has a job-order cost system and uses a predetermined overhead rate based on direct Labour-hours to apply manufacturing overhead to jobs. Manufacturing overhead cost and direct Labour-hours were estimated at £100,000 and 40,000 hours, respectively, for the year. In July, Job #334 was completed at a cost of £5,000 in direct materials and £2,400 in direct Labour. The Labour rate is £6 per hour. By the end of the year, Snappy had worked a total of 45,000 direct Labour-hours and had incurred £110,250 actual manufacturing overhead cost.
-Snappy's manufacturing overhead for the year was:
A) £10,250 underapplied.
B) £12,500 overapplied.
C) £12,500 underapplied.
D) £2,250 overapplieD.
Correct Answer:
Verified
Q24: Galbraith Company applies overhead cost to jobs
Q25: In a job order cost system, the
Q26: The three cost categories appearing on a
Q27: There are two acceptable methods for closing
Q28: Birk applies overhead to jobs at a
Q30: Snappy Company has a job-order cost system
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents