Cox Engineering Performs Cement Core Tests in Its Laboratory During March, the Laboratory Performed 2,000 Core Tests
Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed:
During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of direct labour hours. The following events occurred during March:
8,600 pounds of sand were purchased at a cost of £7,310.
7,200 pounds of sand were used for core tests.
840 actual direct labour hours were worked at a cost of £8,610.
Actual variable manufacturing overhead incurred was £3,200.
-The variable overhead efficiency variance for March is
A) £320 unfavourable.
B) £320 favourable.
C) £360 unfavourable.
D) £360 favourable.
Correct Answer:
Verified
Q1: The purchasing agent of the Clampett
Q2: The Geurtz Company uses standard costing. The
Q3: Managers should only concentrate on meeting a
Q4: Cox Engineering performs cement core tests
Q6: In general, the purchasing agent is responsible
Q7: The Geurtz Company uses standard costing. The
Q8: The Wright Company has a standard
Q9: The following labour standards have been
Q10: Managers should exercise considerable care in their
Q11: Cox Engineering performs cement core tests
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents