Two concurrent activities in a project can be represented in an AOA network by starting and ending on the same node.
Correct Answer:
Verified
Q20: The critical path activities have no slack.
Q22: In PERT, the actual project completion time
Q24: The earliest finish time for the final
Q26: Project _ is a method for shortening
Q27: Three time estimates (optimistic, most likely, and
Q28: The early start for a non-critical activity
Q30: The early start for an activity on
Q55: In PERT, the path with the fewest
Q69: The standard deviation of project duration is
Q80: The PERT pessimistic time estimate is an