A large book publisher has five manuscripts that must be edited as soon as possible. Five editors are available for doing the work, however their working times on the various manuscripts will differ based on their backgrounds and interests. The publisher wants to use an assignment method to determine who does what manuscript. Estimates of editing times (in hours) for each manuscript by each editor is:
-If the optimal assignments include manuscript 1 to editor B, manuscript 2 to editor E, and manuscript 3 to editor C with a total editing time of 47 minutes, what manuscripts are assigned to editors D and A?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q43: A large book publisher has five
Q44: In setting up the an intermediate (transshipment)
Q45: Awards committees need to be formed
Q46: If the optimal solution includes x11 =
Q47: A logistics specialist for Wiethoff Inc.
Q49: A large book publisher has five
Q50: Consider the following transportation problem:
Q51: Awards committees need to be formed
Q52: A logistics specialist for Wiethoff Inc.
Q53: Madlantic Devices designs and manufactures high-end medical
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents