The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R) and sassafras soda (S) . There are at most 12 hours per day of production time and 1,500 gallons per day of carbonated water available. A case of root beer requires 2 minutes of time and 5 gallons of water to produce, while a case of sassafras soda requires 3 minutes of time and 5 gallons of water. Profits for the root beer are $6.00 per case, and profits for the sassafras soda are $4.00 per case. The firm's goal is to maximize profits.
What is the objective function?
A) P = 4R + 6S
B) P = 2R + 3S
C) P = 6R + 4S
D) P = 3R +2S
E) P = 5R + 5S
Correct Answer:
Verified
Q60: The production planner for Fine Coffees, Inc.
Q61: The owner of Crackers, Inc. produces both
Q62: A local bagel shop produces bagels (B)
Q63: The production planner for a private label
Q64: The operations manager of a mail order
Q66: The operations manager of a mail order
Q67: Which of the following constitutes a simultaneous
Q68: An electronics firm produces two models of
Q69: The operations manager for the Blue Moon
Q70: The operations manager for the Blue Moon
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents