Solved

The Production Planner for a Private Label Soft Drink Maker

Question 78

Multiple Choice

The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R) and sassafras soda (S) . There are at most 12 hours per day of production time and 1,500 gallons per day of carbonated water available. A case of root beer requires 2 minutes of time and 5 gallons of water to produce, while a case of sassafras soda requires 3 minutes of time and 5 gallons of water. Profits for the root beer are $6.00 per case, and profits for the sassafras soda are $4.00 per case. The firm's goal is to maximize profits.
Which of the following is not a feasible solution?


A) (R, S) = (0, 0)
B) (R, S) = (0, 240)
C) (R, S) = (180, 120)
D) (R, S) = (300, 0)
E) (R, S) = (180, 240)

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents