As part of its quality-improvement program a company is conducting a time study for a particular job. The time study encompassed 10 job cycles, and the results include the following cumulative times and performance rating factors for each element. An allowance factor of 16% is assumed. The normal cycle time for this job would be
A) 1.809 minutes.
B) 2.098 minutes.
C) 1.530 minutes.
D) 2.233 minutes.
Correct Answer:
Verified
Q2: Work sampling is an easier,cheaper,and quicker approach
Q4: The historical objective behind work measurements and
Q6: The allowance factor is a percentage increase
Q7: In a time study, the normal time
Q7: Workers often do not like to be
Q10: Work sampling tends to be more disruptive
Q12: Under normal circumstances and conditions,the time required
Q14: _ time is the time required by
Q17: Determining the length of time it takes
Q19: Work sampling is a technique for determining
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents