As part of its quality-improvement program a company is conducting a time study for a particular job. The time study encompassed 10 job cycles, and the results include the following cumulative times and performance rating factors for each element. An allowance factor of 16% is assumed. As part of its quality-improvement program a company is conducting a time study for a particular job. The time study encompassed 10 job cycles, and the results include the following cumulative times and performance rating factors for each element. An allowance factor of 16% is assumed.   The normal cycle time for this job would be A)  1.809 minutes. B)  2.098 minutes. C)  1.530 minutes. D)  2.233 minutes. The normal cycle time for this job would be


A) 1.809 minutes.
B) 2.098 minutes.
C) 1.530 minutes.
D) 2.233 minutes.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents