To maintain the synchronization required for theory of constraints,Goldratt introduced the concept of
A) drum-buffer-rope.
B) transfer batches.
C) manufacturing execution systems.
D) None of these answer choices is correct.
Correct Answer:
Verified
Q82: A _ chart is used to show
Q83: Why is monitoring an important component of
Q84: With _ scheduling,loading and sequencing decisions are
Q85: _ are based on natural selection properties
Q86: Employee scheduling has _ options compared to
Q88: _ scheduling involves loading work onto the
Q89: Identifying the bottleneck is the _ step
Q90: What makes scheduling so difficult in a
Q91: A _ is shop paperwork that travels
Q92: The class of software,with libraries of algorithms
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents