As part of a time study a particular job was analyzed.The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported: Assuming an allowance factor of 15%,the standard time for this job would be
A) 4.35 minutes.
B) 3.67 minutes.
C) 2.712 minutes.
D) 2.358 minutes.
Correct Answer:
Verified
Q1: In a time study the standard time
Q2: Work sampling is an easier,cheaper,and quicker approach
Q3: As part of its quality-improvement program a
Q4: The historical objective behind work measurements and
Q6: The allowance factor is a percentage increase
Q7: Workers often do not like to be
Q8: The normal time to perform a job
Q9: Advantages of using a predetermined motion time
Q10: Work sampling tends to be more disruptive
Q11: A time study is a statistical sample
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents