Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line.The schedule requires 80 ovens in an 8-hour day.The assembly includes seven tasks.The table below indicates the performance time and the sequence requirements for each task.
a.What is the cycle time for this assembly operation?
b.What is the theoretical minimum number of workstations?
c.Draw the precedence diagram.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q99: A work cell is required to make
Q143: An assembly line with 11 tasks is
Q151: A work cell is required to make
Q152: A firm operates a flow shop building
Q153: The flow and distance data in the
Q154: An insurance claims processing center has six
Q156: Hemo-tech,Inc. ,a biomedical technology and research laboratory,produces
Q158: A company is trying to balance production
Q160: A company is designing a product layout
Q161: An assembly line is assigned as follows.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents