Develop a solution for the following line balancing problem,allowing a cycle time of 5 minutes.
a.Draw the precedence diagram for the set of tasks.
b.Calculate the theoretical minimum number of workstations.
c.Balance this line using the longest task time heuristic.
d.What tasks are assigned to which stations?
e.Does the solution have the minimum number of stations? Explain.
f.How much idle time is there,summed over all workstations?
g.What is the efficiency of this line?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q130: An assembly line has been designed to
Q132: An assembly line consists of 21 tasks
Q133: A company is designing a product layout
Q135: An assembly line consists of 158 tasks
Q136: You have been asked to balance a
Q137: Cyclone Appliances has developed a new European-style
Q139: An electronics manufacturer makes remote control devices
Q283: If a layout problem is solved by
Q296: Which of the following is NOT a
Q315: Identify the formulas for the following terms
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents