expand icon
book Managing Supply Chain and Operations 1st Edition by Thomas Foster ,Scott Sampson,Cynthia Wallin,Scott Webb cover

Managing Supply Chain and Operations 1st Edition by Thomas Foster ,Scott Sampson,Cynthia Wallin,Scott Webb

النسخة 1الرقم المعياري الدولي: 9780134110219
book Managing Supply Chain and Operations 1st Edition by Thomas Foster ,Scott Sampson,Cynthia Wallin,Scott Webb cover

Managing Supply Chain and Operations 1st Edition by Thomas Foster ,Scott Sampson,Cynthia Wallin,Scott Webb

النسخة 1الرقم المعياري الدولي: 9780134110219
تمرين 17
The following tasks are required to assemble a product. The following tasks are required to assemble a product.   a. What takt time is required to achieve an hourly output of 30 units per hour? b. Calculate the minimum number of workstations required to achieve the desired output. c. Use the longest operating time (LOT) heuristic to assign tasks to workstations. d. What is the efficiency of the line balance you determined in part c? e. What is the balance delay of the line balance you determined in part c? a. What takt time is required to achieve an hourly output of 30 units per hour?
b. Calculate the minimum number of workstations required to achieve the desired output.
c. Use the longest operating time (LOT) heuristic to assign tasks to workstations.
d. What is the efficiency of the line balance you determined in part c?
e. What is the balance delay of the line balance you determined in part c?
التوضيح
موثّق
like image
like image

Line balancing:
The process assigning t...