expand icon
book Managing Supply Chain and Operations 1st Edition by Thomas Foster ,Scott Sampson,Cynthia Wallin,Scott Webb cover

Managing Supply Chain and Operations 1st Edition by Thomas Foster ,Scott Sampson,Cynthia Wallin,Scott Webb

النسخة 1الرقم المعياري الدولي: 9780134110219
book Managing Supply Chain and Operations 1st Edition by Thomas Foster ,Scott Sampson,Cynthia Wallin,Scott Webb cover

Managing Supply Chain and Operations 1st Edition by Thomas Foster ,Scott Sampson,Cynthia Wallin,Scott Webb

النسخة 1الرقم المعياري الدولي: 9780134110219
تمرين 9
Complete the MRP record for the end item, item A, that has a gross requirement of 500 in week 3 and 1500 in week 5. The lead time for this item is two weeks. Currently, there are 300 items on hand with a scheduled receipt of 100 items in week 2. The item has a two-week lead time, and its order quantity is lot for lot.
التوضيح
موثّق
like image
like image

Material requirement management (MRP):
...