
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
النسخة 7الرقم المعياري الدولي: 978-0073376301
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
النسخة 7الرقم المعياري الدولي: 978-0073376301 تمرين 45
El Paso Water Utilities (EPWU) purchases surface water for treatment and distribution to EPWU customers from El Paso County Water Improvement District during the irrigation season. A new contract between the two entities resulted in a reduction in future price increases in the cost of the water from 8% per year to 4% per year for the next 20 years. If the cost of water next year (which is year 1 of the new contract) will be $260 per acre-foot, what is the present worth of the savings (in $/acre-ft) to the utility between the old and the new contracts Let the interest rate equal 6% per year.
التوضيح
The rate of increase in saving is 4% for...
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

