
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
النسخة 7الرقم المعياري الدولي: 978-0073376301
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
النسخة 7الرقم المعياري الدولي: 978-0073376301 تمرين 44
A proposal to reduce traffic congestion on I-5 has a B/C ratio of 1.4. The annual worth of benefits minus disbenefits is $560,000. What is the first cost of the project if the interest rate is 6% per year and the project is expected to have a 20-year life
التوضيح
The formula for B/C ratio is as follows:...
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

